Projects Overview

Print
PDF

CSCA-Vinnitsa Ltd provides all scope of engineering services: from the concept and design of control system up to on-site commissioning and ongoing service support.

Standard scope of work includes the following:

  • Scope Definition and Budget
  • Design Documentation and Estimates Development
  • Application Software Development (PLC / SCADA / Data Base and Reporting)
  • Equipment Supply and Assembling on our own site
  • System Installation Supervision
  • Commissioning and Startup
  • Training (Operator/Engineer/Maintenance)
  • Ongoing  Warranty and Service Maintenance

Company  has all necessary licenses and certificates for design and construction. Design documentation is developed according to state standards, regulations and guidelines.

Openness and flexibility of designed systems provide the possibility of further troublefree buildup and integration with existing or new developed systems.
In our projects we mostly use proved equipment and accessories of leading manufacturers to ensure high efficiency and reliability of proposed solutions. Up to now we have more than 10 year experience of working with such world-known companies as: Siemens, Mitsubishi Electric, Moeller EATON, DiniArgeo, Citect, Wonderware Intouch, ZPAS, Rittal, Moxa etc.

All our systems are provided with standard 12 month warranty since startup. In addition, we provide after-sales system support, what is especially actual for customers without  their own maintenance staff.

Since 2001 our engineers have assisted in development of more than fifty projects for different industry branches (up to 2010 in the structure of "CSC-Automation" Vinnitsa Branch Ltd). The list of main projects is given bellow:

Project Description Object Scope of work Period
MINING AND METALLURGY
Industrial control system of iron ore pellets
producing shop (lines 1-2, lines 3-4)
JSC «Poltavsky GOK»,
Poltava region
project (field and central parts), installation supervision, commissioning 2001, 2006
Automated control system of electrical smelting
furnace batch charging
JSC «Zaporozhabrasive», Zaporozhye project (field and central parts), installation supervision, commissioning 2003
Automatic control system of continuous handling equipment for kiln smelting shop Pobuzhsky Ferronickel Plant
LTD, Kirovograd region
project (field and central parts), installation supervision, commissioning 2003, 2004
Automatic control system of ferroalloy ore smelting furnace’s electrical mode Pobuzhsky Ferronickel Plant
LTD, Kirovograd region
project (field and central parts), installation supervision, commissioning 2003, 2005
Automatic continuous-handling control system of the crushing division JSC «Yuzhny GOK»
Krivoy Rog
project (central part), installation supervision, commissioning 2004
Supervisory control automated system
for ore-dressing and processing enterprise
JSC «Yuzhny GOK»
Krivoy Rog
project (central part), installation supervision, commissioning 2005
Industrial control system for coal preparation shop JSC «ArcelorMittal
Kryvoy Rog», Kryvoy Rog
project (field and central parts), installation supervision, commissioning 2003, 2008
Industrial control system for coking products
recovery shop
JSC «ArcelorMittal
Kryvoy Rog», Kryvoy Rog
project (field and central parts) 2006, 2008
Automatic control system of rotary kiln furnaces Pobuzhsky Ferronickel Plant
LTD, Kirovograd region
project (field and central parts), installation supervision, commissioning 2006, 2007
Reconstruction of aluminous factory. Industrial control system of bauxite ore pulp preliminarily desiliconization JSC «Nikolaev Alumina Plant» project (central part) 2007
Industrial control system for outdoor coal storage
of coal preparation shop
Metallurgical Integrated Plant «AzovStal», Mariupol project (field and central parts) 2008
Automated control system of technological process, electrical equipment and control instrumentation of BKZ-50-39 steam boiler JSC «Yasinovsky COP»,
Donetsk region
project (field and central parts) 2008
Industrial control system of the coke-oven gas
from the hydrogen sulphide clearing unit using the momoethanolamine solution
JSC «Yasinovsky COP»,
Donetsk region
project (field and central parts) 2008
Industrial control system for desulphurization shop JSC «ArcelorMittal
Kryvoy Rog», Kryvoy Rog
project (field and central parts), installation supervision, commissioning 2007, 2009
Automatic control system of experimental-industrial unit for slime processing JSC «Poltavsky GOK»,
Poltava region
project (field and central parts), installation supervision, commissioning 2011
Industrial process control system of crushed ore preparation JSC «Poltavsky GOK»,
Poltava region
project (field and central parts) 2011
Industrial process control system of thyristor frequency invertor unit with pumps XR-350. JSC «Poltavsky GOK»,
Poltava region
project (field and central parts), installation supervision, commissioning 2012
Process control system of finished products loading into railcar of 106a railway JSC «Poltavsky GOK»,
Poltava region
project (central part), installation supervision, commissioning 2012
Process control system of compressor stations for coke oven gas compression. Rectification workshop JSC «Yasinovsky COP»,
Donetsk region
project (central part), installation supervision, commissioning 2012
Reconstruction of remote control system for central supervisory center JSC «Poltavsky GOK»,
Poltava region
project (central part) 2012
Automated control system of unit for charge thermal pretreatment JSC «Yasinovsky COP»,
Donetsk region
project (central part), installation supervision, commissioning 2013
Crushing and concentration factory. Automated control system of ore loading into parabolic bunkers JSC «Poltavsky GOK»,
Poltava region
project (field and central parts), installation supervision, commissioning 2013
PETROCHEMICAL INDUSTRY
Industrial control system of synthetics detergent
production shop
JSC «VinnitsaBytHim»,
Vinnitsa
project (central part), installation supervision, commissioning 2001
Industrial control system of dark-oil product farm PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2001, 2006
Automated control system of ammonia
dispensing stations
UGP «Transammiak»,
Donetsk region
project (field and central parts), installation supervision, commissioning 2002, 2003
Industrial control system of liquefied
gas storage tank farm
PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2003
Industrial control system of fuel station PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2003
Automatic control system of electrical desalting unit
with atmospheric pipe still
PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2003
Automatic control system of wet-process phosphoric
acid production
JSC «Dneprovsky Mineral Fertilizers Plant», Dneprodzerginsk project (central part), installation supervision, commissioning 2005
Industrial control system of oil tank farm Feodosia Oil Terminal, Simferopol project (central part), installation supervision, commissioning 2005, 2006
Automation system of air compressors PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2006
Automatic control and ESD system of turbocompressors
for the G-39-40 dewaxing and deoiling unit
PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2006
Industrial control system of G-24 oil fractions
hydrofining unit
PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2007
Automated control system of pulsed-mixing crystallizer
for G-39-40 dewaxing and deoiling unit
PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2007
Industrial control system of plastisol production shop JSC «Koryukovka’s factory of technical papers», Chernigov region project (central part), installation supervision, commissioning 2008
Automated control system of tank farm №9 and
liquefied gas railway loading gantry
PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2008
Automatic control system of atmospheric and
vacuum distillation unit
PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2003, 2009
Modernization of process control system for filter house
of G-39-40 dewaxing and deoiling unit
PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2011
PSA unit, unit of compression of power gas. Reconstruction of unit of dry gas desulfurization. Process control system PJSC «Ukrtatnafta»,
Kremenchug
project (central part), installation supervision, commissioning 2012-2013
BUILDING MATERIALS PRODUCTION
Automated control system of bulk cement shipping
into auto and railway transport
JSC «Nikolaev Cement Factory», Nikolaev project (central part), installation supervision, commissioning 2002
Automated control system of bulk tanker cement
shipping
JSC «Podolsky cement»,
Kamenets-Podolsky
project (central part), installation supervision, commissioning 2003
Industrial control system of concrete batch mixing unit

Industrial-Construction Group «KOVALSKA», Kiev project (field and central parts), installation supervision, commissioning 2003-2010
Automated control system of dry building mixes
production line
Henkel Bautechnik Ltd. (Ukraine, Russia, Belarus) project (field and central parts), installation supervision, commissioning 2003-2011
Automatic control system of sand lime brick
pressing line
Sand Lime Brick Plant «Meteor», Moldova project (field and central parts), installation supervision, commissioning 2006
Automatic control sytem of dry building mixes
production
Fomalhaut-Polimin Ltd. Kiev project (field and central parts), installation supervision, commissioning 2007
Automated control system of crushing and screening production line Omelyanovsky Quarry Ltd, Zhytomyr region project (field and central parts), installation supervision, commissioning 2009
Automated control system of batching unit for figured paving production Industrial-Construction Group «KOVALSKA», Kiev project (central part), installation supervision, commissioning 2010
Automated control system of coloring agents batching
for concrete mixtures
Beton Complex Ltd, Kiev project (central part), installation supervision, commissioning 2010
Reconstruction of concrete batch mixing plant.
Automated control system
JSC «Budindustriya»
Chernigov
project (field and central parts), installation supervision, commissioning 2010
Automated control system of concrete batch mixing unit Starokonstantinov Concrete Sleeper Plant, Khmelnitsky region project (central part), installation supervision, commissioning 2011
Automated control and monitoring system of water-dispersion paint-and-lacquer materials production Industrial-Construction Group «KOVALSKA», Kiev project (field and central parts), installation supervision, commissioning 2011
Automated control system of concrete batch mixing unit CJSC “Beton Nova”, Donetsk region project (central part), installation supervision, commissioning 2011
Automated control system of concrete batch mixing unit Reinforced-Concrete Products Plant №7, Poltava region project (central part), installation supervision, commissioning 2012
Automated control system of concrete batch mixing unit Gnivanspetszhelezobeton, Vinnitsa region project (central part), installation supervision, commissioning 2012
Automated control system of concrete batch mixing unit. Modernization. ODO “Khmelnitskzhelezobeton”, Khmelnitsky region project (central part), installation supervision, commissioning 2012
Modernization of concrete batch mixing unit 20, 21. PCS.
Beton Complex Ltd, Kiev project (central part), installation supervision, commissioning 2012
Аutomated control and monitoring system of chemical additives storage
Beton Complex Ltd, Kiev project (central part), installation supervision, commissioning 2013
Reconstruction of concrete batch mixing unit. Automation.
PJSC «Darnytsky Reinforced-Concrete Products Plant» project (central part), installation supervision, commissioning 2013
FOOD AND BEVERAGE
Industrial control system of C.I.P. shop
and beer storage tank section
Rogan Brewery,
Kharkov
project (field and central parts), installation supervision, commissioning 2002
Automatic batch control system of blending shop DC "Nemiroff",
Vinnitsa region
project (field and central parts), installation supervision, commissioning 2003
Industrial control system of vegetable oil-extraction production Oil-and-Fat-Production Plant, Vinnitsa
project (field and central parts), installation supervision, commissioning 2004
Emergency shut down system of oil-extraction shop Oil-and-Fat-Production Plant, Chernovtsy
project (central part), installation supervision, commissioning 2004
Automated liquid components batching and
temperature control system for creamery
Butter and Cheese Plant, Tulchyn project (field and central parts), installation supervision, commissioning 2006
Automatic control system of FPN type suspended centrifuges JSC «Podolsky sahar»,
Vinnitsa region
project (field and central parts), installation supervision, commissioning 2006
Industrial control system of soybeans pressing shop DC «Thegra Ukraine LTD», Gaysin, Vinnitsa region project (field and central parts), installation supervision, commissioning 2006
Raw milk reception automation system JSC «Bershadmoloko»,
Vinnitsa region
project (field and central parts), installation supervision, commissioning 2009
Automated control system of denatured ethyl spirit production Uladovsky Distillate Spirit Plant, Vinnitsa region project (field and central parts), installation supervision, commissioning 2010
Automated control system of silo bin loading for seed processing plant Ltd. «Agrograd-V» Vinnitsa central project, installation supervision, commissioning 2010
Automated control system of compound feed production Kremiks Ltd, Poltava region project (field and central parts), installation supervision, commissioning 2010
Automated control system of grain elevator. Modernization Mriya Agro Holding, Ternopol region central project, installation supervision, commissioning 2011
Automated control system of batching unit for compound feed production plant. Modernization Kremiks Ltd, Poltava region central project, installation supervision, commissioning 2012
Аutomated control system of half-finished product preparation for candy filling on «GRAND TOFFY» line Vinnitsa confectionery factory ROSHEN project (field and central part), installation supervision, commissioning 2013
Аutomated control system of aseptic line washing AGRANA Fruit Ukraine application software, commissioning 2013

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)