Crushing and concentration factory. Automated control system of ore loading into parabolic bunkers

Customer: JSC «Poltavsky GOK», Komsomolsk, Poltava regionControl Object

Hardware / Software: SINAMICS G120 | distributed I/O devices Siemens ET200M | PLC Siemens S7-400H | Siemens MP-377 HMI | WinCC Flexible | Profibus-DP | Industrial Ethernet

Scope of work: project (field and central parts)

Year of implementation: 2013


Read more...

Automated control system of unit for charge thermal pretreatment

Customer: JSC «Yasinovsky Coke Oven and By-product Plant», Donetsk region Control Object

Hardware / Software: distributed I/O devices Siemens ET-200M | PLC Siemens S7-400H | CitectSCADA | Profibus-DP | Industrial Ethernet

Scope of work: field and central project, installation supervision, commissioning

Year of implementation: 2013


Read more...

Process control system of compressor stations for coke oven gas compression. Rectification workshop

Customer: JSC «Yasinovsky Coke Oven and By-product Plant», Donetsk region Control Object

Hardware / Software: PLC Siemens S7-300 | Siemens MP-377 HMI | WinCC Flexible | Profibus-DP | Industrial Ethernet

Scope of work: central project, installation supervision, commissioning

Year of implementation: 2012


Read more...

Reconstruction of remote control system for central supervisory center

Customer: JSC «Poltavsky GOK», Komsomolsk, Poltava region Control Object

Hardware / Software: SINAUT ST7 communication modules | PLC Siemens S7-300 | WinCC | Videowall | Industrial Ethernet (electrical, optical)

Scope of work: central project

Year of implementation: 2012


Read more...

Process control system of finished products loading into railcar of 106a railway

Customer: JSC «Poltavsky GOK», Komsomolsk, Poltava region Control Object

Hardware / Software: invertors Mitsubishi Electric FR-740 series |distributed I/O devices Siemens ET200M | PLC Siemens S7-300 | WinCC Flexible | ModBus | Profibus-DP | Profinet IO

Scope of work: project (field and central parts), installation supervision, commissioning

Year of implementation: 2012


Read more...

Industrial process control system of thyristor frequency invertor unit with pumps XR-350


Customer: JSC «Poltavsky GOK», Komsomolsk, Poltava region Control Object

Hardware / Software: distributed I/O devices Siemens ET200M | PLC Siemens S7-400H | Siemens MP377 | WinCC Flexible | Redundant MPI | Redundant Profibus-DP | Redundant Ethernet

Scope of work: project (field and central parts)

Year of implementation: 2012


Read more...

Projects by Industry

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)