Automated control system of BKZ-50-39 steam boiler

Print
PDF

Customer: JSC «Yasinovsky Coke Oven and By-product Plant», Donetsk region Control Object

Hardware / Software: Distributed I/O devices Siemens ET200M | redundant PLC Siemens S7-400H | CitectSCADA | redundant Profibus-DP | redundant Industrial Ethernet

Scope of work: project development (field and central parts)

Year of implementation: 2008


Key features of the system:

  • Total number of actuators:
  • Total number of I / O signals, including:
    - analog inputs:
    - analog outputs:
    - digital inputs:
    - digital outputs:
  • Total number of control cabinets:
  • Total number of controllers:
  • Total number of remote I/O devices:
  • Total number of workstations:
15
200
41
4
105
50
4
1
2
2

Photomaterials:


System Structure

* this project was developed and implemented while working in "CSC-Automation" Vinnitsa Branch Ltd

Projects by Industry

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)