Industrial control system of bauxite ore pulp preliminarily desiliconization. Reconstruction


Customer: JSC «Nikolaev Alumina Plant» Nikolaev region Control Object

Hardware / Software: distributed I/O devices Siemens ET200M | PLC Siemens S7-300 | CitectSCADA | Profibus-DP | Industrial Ethernet

Scope of work: project development (central part)

Year of implementation: 2007


Key features of the system:

  • Total number of actuators:
  • Total number of I / O signals, including:
    - analog inputs:
    - analog outputs:
    - digital inputs:
    - digital outputs:
  • Total number of control cabinets:
  • Total number of controllers:
30
330
81
23
137
90
3

Photomaterials:


System Structure PLC Control Cabinet Distributed I/O Control Cabinet Process Screen Process Screen


* this project was developed and implemented while working in "CSC-Automation" Vinnitsa Branch Ltd

Projects by Industry

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)