Automatic control system of continuous handling equipment

Print
PDF

Customer: Pobuzhsky Ferronickel Plant Ltd, Kirovograd region Control Object

Hardware / Software: Remote I/O MELSEС-ST | PLC Mitsubishi Electric System Q | CitectSCADA | Profibus-DP | Industrial Ethernet

Scope of work: project (field and central parts), supply, installation supervision, commissioning

Year of implementation: 2003-2004


Key features of the system:

  • Total number of actuators:
  • Total number of I / O signals, including:
    - digital inputs:
    - digital outputs:
  • Total number of control cabinets:
  • Total number of controllers:
  • Total number of I/O remote devices:
96
640
464
176
5
1
3

Photomaterials:


System Structure Operator's Control Panel Remote I/O Control Cabinet PLC Control Cabinet


* this project was developed and implemented while working in "CSC-Automation" Vinnitsa Branch Ltd

Projects by Industry

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)