Process control system of finished products loading into railcar of 106a railway

Customer: JSC «Poltavsky GOK», Komsomolsk, Poltava region Control Object

Hardware / Software: invertors Mitsubishi Electric FR-740 series |distributed I/O devices Siemens ET200M | PLC Siemens S7-300 | WinCC Flexible | ModBus | Profibus-DP | Profinet IO

Scope of work: project (field and central parts), installation supervision, commissioning

Year of implementation: 2012


Key features of the system:

  • Total number of I / O signals, including:
    - digital inputs:
    - digital outputs:
  • Total number of controllers:
  • Total number of distributed I/O devices:
  • Total number of workstations:
more than 80
74
7
1
1
1

Photomaterials:


Process ScreenInvertor Control Cabinet PLC Control Cabinet

Projects by Industry

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)