Crushing and concentration factory. Automated control system of ore loading into parabolic bunkers

Print
PDF

Customer: JSC «Poltavsky GOK», Komsomolsk, Poltava regionControl Object

Hardware / Software: SINAMICS G120 | distributed I/O devices Siemens ET200M | PLC Siemens S7-400H | Siemens MP-377 HMI | WinCC Flexible | Profibus-DP | Industrial Ethernet

Scope of work: project (field and central parts)

Year of implementation: 2013


Key features of the system:

  • Total number of level measurement channels:
  • Total number of I / O signals, including:
    - digital inputs:
    - digital outputs:
  • Total number of controllers:
  • Total number of distributed I/O devices:
  • Total number of operator's panel:
more than 50
more than 80
72
14
1
2
4

Photomaterials:


Process Screen


Projects by Industry

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)