Process control system of dark-oil product farm

Print
PDF

Customer: JSC «Ukrtatnafta», Kremenchug, Poltava region Control Object

Hardware / Software: distributed I/O devices Siemens ET200M | PLC Siemens S7-300 | SCADA Wonderware InTouch | MPI | ModBus | Profibus-DP | Industrial Ethernet

Scope of work: central project, installation supervision, commissioning

Year of implementation: 2001 (1-st stage), 2003 (2-nd stage), 2004 (3-rd stage), 2006 (4-th stage)


Key features of the system:

  • Total number of actuators:
  • Total number of I / O signals, including:
    - analog inputs:
    - analog outputs:
    - digital inputs:
    - digital outputs:
  • Total number of control cabinets:
  • Total number of controllers:
  • Total number of distributed I/O devices:
  • Total number of workstations:
more than 120
1415
176
17
848
346
14
4
7
2

Photomaterials:


System Structure Operator's control panel PLC Control Cabinet Valve's Control Cabinet ШValve's Control Cabinet


* this project was developed and implemented while working in "CSC-Automation" Vinnitsa Branch Ltd

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)