Automatic control and ESD system of turbocompressors for the G-39-40 unit


Customer: JSC «Ukrtatnafta», Kremenchug, Poltava region Control Object

Hardware / Software: distributed I/O devices Siemens ET200S | SIMATIC C7-635K Control Systems | SCADA Wonderware InTouch | Profibus-DP | Industrial Ethernet

Scope of work: central project, installation supervision, commissioning

Year of implementation: 2006


Key features of the system:

  • Total number of actuators:
  • Total number of I / O signals, including:
    - analog inputs:
    - analog outputs:
    - digital inputs:
    - digital outputs:
  • Total number of control cabinets:
  • Total number of SIMATIC C7 control systems:
  • Total number of distributed I/O devices:
  • Total number of workstations:
22
more than 240
85
6
73
78
5
3
3
2

Photomaterials:


System Structure Process Screen Control Window Screens


* this project was developed and implemented while working in "CSC-Automation" Vinnitsa Branch Ltd

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)