Аutomated control system of half-finished product preparation for candy filling on «GRAND TOFFY» line

Customer: Vinnitsa confectionery factory ROSHENControl Object

Hardware / Software: weight modules Siemens SIWAREX U | PLC Siemens S7-300 | Siemens MP377 HMI | WinCC Flexible | Profibus-DP | Industrial Ethernet

Scope of work: field and central project, installation supervision, commissioning

Year of implementation: 2013


Key features of the system:

  • Batching accuracy, %:
  • Number of automatic batchers:
  • Number of batching components per dosing device:
  • Total number of actuators:
  • Total number of I / O signals:
0,1-0,5
1
3-10
more than 30
more than 150

Photomaterials:


Control Room Control Cabinet Process Screen


Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)