Automatic control system of dry building mixes production

Print
PDF

Customer: Fomalhaut-Polimin Ltd. Kiev Control Object

Hardware / Software: SCHENCK Weighing Transmitters | PLC Mitsubishi Electric System Q | CitectSCADA | Profibus-DP | Industrial Ethernet

Scope of work: central project, installation supervision, commissioning

Year of implementation: 2007


Key features of the system:

  • Total number of actuators:
  • Total number of I / O signals, including:
    - analog inputs:
    - analog outputs:
    - digital inputs:
    - digital outputs:
  • Total number of control cabinets:
  • Total number of controllers:
  • Total number of workstations:
32
156
6
2
101
47
2
1
1

* this project was developed and implemented while working in "CSC-Automation" Vinnitsa Branch Ltd

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)