Аutomated control and monitoring system of chemical additives storage

Print
PDF

Customer: Industrial-Construction Group «KOVALSKA, Kiev (Beton Complex Ltd)Control Object

Hardware / Software: weight indicators DiniArgeo DGT4  | PLC Siemens SIMATIC ET200S  | WinCC Flexible | ModBus | Industrial Ethernet

Scope of work: field and central project, installation supervision, commissioning

Year of implementation: 2013


Key features of the system:

  • Batching accuracy, %:
  • Number of automatic batchers:
  • Number of batching components per dosing device:
  • Total number of actuators:
  • Total number of I / O signals:
0,1-0,5
3
2-8
65
more than 200

Photomaterials:


System Structure Process Screen Control Cabinet


Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)