Automated control system of crushing and screening production line


Customer: Omelyanovsky Quarry Ltd, Zhytomyr region Control Object

Hardware / Software: PLC Mitsubishi Electric System Q | CitectSCADA |                 Profibus-DP | Industrial Ethernet

Scope of work: project (field and central parts), installation supervision, commissioning

Year of implementation: 2009


Key features of the system:

  • Total number of actuators:
  • Total number of I / O signals, including:
    - analog inputs:
    - analog outputs:
    - digital inputs:
    - digital outputs:
  • Total number of control cabinets:
  • Total number of controllers:
  • Total number of workstations:
40
606
46
16
416
128
10
2
2

Photomaterials:


System Structure Control Cabinets Lead-in distribution cabinet Lead-in distribution cabinet PLC Control Cabinet

Cabinet of electrical equipment Cabinet of electrical equipment Local control cabinet


* this project was developed and implemented while working in "CSC-Automation" Vinnitsa Branch Ltd

Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)