Customer: Industrial-Construction Group «KOVALSKA, Kiev (Beton Complex Ltd) Control Object

Hardware / Software: weight indicators DiniArgeo DGT Q | PLC Mitsubishi Electric System Q | CitectSCADA | ModBus | Industrial Ethernet

Scope of work: central project, installation supervision, commissioning

Year of implementation: 2012


Key features of the system:

  • Batching accuracy, %:
  • Number of automatic batchers:
  • Number of batching components per dosing device:
  • Total number of I / O signals:
  • Total number of control cabinets:
0,1-0,5
4
2-8
more than 200
2

Photomaterials:


Control Room Control Cabinets


Standard project includes:

  • Automation Plans
  • Schematic Diagrams (electrical, pneumatic, etc.)
  • Connection Diagrams and External Wiring Connections
  • Drawings of Equipment and External Wiring Location
  • Specification of Equipment and Materials
  • Estimates for Installation, Commissioning etc.
  • Documentation for Control Cabinets and Operating Consoles
  • PLC and SCADA Software
  • Operation and maintenance documentation (including operator manuals, instructions for maintenance, software and hardware description etc.)